Henan · Zhejiang · Sichuan · Guizhou·Est. 1992·Press floor running 12 / 7
viii.

Bespoke

工 藝

Bespoke on the Huamei floor — the materials, the use cases, the operational details.

6–10 wks engineering·From 100 units·Named after the brand

What it is.

i.
i. Philosophy

When none of the standard structures answer the brief. Hexagonal footprints, tessellating stacks, asymmetric reveals, hidden drawers behind concealed seams. Engineered from scratch on the factory floor.

We start with the contents and work outward. A perfume that pours from an unconventional flacon needs a cradle no folding template covers; a calendar of twenty-four asymmetric drawers needs a shell engineered to hold them. We sketch, prototype in white blanks, and refine over two or three rounds before cutting the final dies.

Lead time runs 6–10 weeks for the engineering alone; the production schedule follows. Minimum 100 units typical. We name each structure after the brand on the colophon — six are on file, each in a single archive.

In the archive.

All 3 volumes →

Specification.

Huamei · Archive
Min run
300 pcs
Lead time
20 – 28 days
Substrates
Coated · Uncoated · Cloth
Certifications
FSC · PEFC · ISO 14001
Tolerance
±0.1 mm
Sample turn
72 hr
Samples · Posted free

Begin with bespoke.

Every topic in the Huamei archive starts the same way — a brief, a sample, a price band. We post first-round samples free of charge.