Henan · Zhejiang · Sichuan · Guizhou·Est. 1992·Press floor running 12 / 7
Craft·By Structure·Magnetic
ii.

Magnetic

工 藝

Magnetic on the Huamei floor — the materials, the use cases, the operational details.

4–8 N42 magnets·Pull-tested 5,000 cycles·24–32 days

What it is.

i.
i. Philosophy

A flap that closes itself. Four to eight Type-N neodymium magnets sit hidden under the paper wrap, embedded in the lid and the base. The lid pulls home with a soft thunk and the seam disappears.

Built on the rigid two-piece chassis with a third element — the hinged flap — wrapped in the same stock as the rest of the box. Common on jewellery, watches, and any project where the box doubles as a keepsake on a shelf.

We pull-test every closure: 5,000 cycles, then ten random samples from each batch. Foil and emboss work the same as on a plain rigid. Lead time runs 24–32 days; the magnet sourcing adds about a week.

In the archive.

All 1 volume →

Specification.

Huamei · Archive
Min run
300 pcs
Lead time
20 – 28 days
Substrates
Coated · Uncoated · Cloth
Certifications
FSC · PEFC · ISO 14001
Tolerance
±0.1 mm
Sample turn
72 hr

What buyers ask first.

Huamei · FAQ

What's the minimum order quantity for a magnetic-flap rigid box?

200+ pieces for rigid magnetic-flap construction. Some structures run lower on a per-project quote — ask in the brief.

How long does a magnetic-flap rigid box take to produce?

Samples turn in 7–10 days. Production runs 24–32 days from approved sample. Magnet sourcing adds a week at very low volume.

How strong is the magnetic closure?

Pull-force sits between 6 and 50 grams at 2,800 Gauss, tuned to lid weight and closure geometry. See the magnetic pull-force article for the full range.

Read further.

Notes from the press floor
Press Kit Box Packaging: How to Spec a Launch Box for PR and Trade PresentationsA press kit box must open dramatically, survive courier delivery, and display products without secondary cartons. Here is the full specification guide — structure, MOQ, lead time, and brief format.Custom Hanukkah Gift Box Packaging: Lead Times and Specifications for US BrandsHanukkah 2026 falls on 25 December — US brands must place orders by September to ship on time. Here is what to spec, which finishes work, and what certifications to require.Luxury Travel Retail Packaging: Airport Duty-Free Gift Set SpecificationsTravel retail packaging must open one-handed, survive carry-on transit, and meet duty-free operator display requirements. Here is the specification guide for airport duty-free gift sets.
Made for ·Wuliangye
Samples · Posted free

Begin with magnetic.

Every topic in the Huamei archive starts the same way — a brief, a sample, a price band. We post first-round samples free of charge.